Workstream | Added to the specification / complete | Architecture RoadmapDone Ready for | IRB ARB Review | Now What We're Working on Today | Next Next Priorities* | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Specification Content |
| Workflow For Patient Follow up | EMR ↔ Community system exchange for patient follow up
| |||||||
Review to ensure mADX is included. Change drawing to not assume that mADX/ADX report comes from HMIS.
|
|
|
Panel | |||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||
Begin to support the Spanish version of the diagram. Redefine SHR requirements based upon FHIR
|
Panel | ||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||
Defining data exchanges. (Link)
| PATH |
Status | |||||
---|---|---|---|---|---|
|
|
Panel | ||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||
Review CR requirements to ensure PMIR and other FHIR standards are in there. Check for changes due to CR offline transactions. Merging recent activities to define lab system requirements
|
Panel | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||
Translation into French and Spanish Defining data exchanges.
|
Panel | |||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||
EMR ↔ Community system exchange for patient follow up (Link)
|
Panel | ||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||
Redefine SHR requirements based upon FHIR
HIV Case reporting and COVID case reporting.
| Jembi |
|
Panel | ||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||
Redefine SHR transactions based upon FHIR. Is the component a SHR or does the picture need a patient-level data repository as well?
|
Panel | |||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||
HIV Case reporting and COVID case reporting. Establish base requirements for the product catalogue.
| ? |
|
Status | |||||
---|---|---|---|---|---|
|
|
Panel | ||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||
Review CR requirements to ensure PMIR and other FHIR standards are in there. Check for changes due to CR offline transactions. Merging recent activities to define lab system requirements
|
Panel | |||||||||
---|---|---|---|---|---|---|---|---|---|
| |||||||||
Establish a community or working group to address how imaging fits into the Architecture.
|
Panel | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Change the wording for "Workflow" per meeting comments from 2022-10-10 OHIE Architecture Call
|
Panel | ||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||
Establish base requirements for the product catalogue.Review to ensure mADX is included. Change drawing to not assume that mADX/ADX report comes from HMIS.
|
Panel | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Review OHIE lab workflows with OMRS team to see if there are changes, additions, clarifications
|
Panel | |||||||||
---|---|---|---|---|---|---|---|---|---|
| |||||||||
Determine a process for documenting the use cases for each of the data exchanges
|
Panel | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||
Determine how to link FHIR IGs to the specification.
|
Panel | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Determine and document ownership in the specification content sections.
|
Panel | ||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||
Establish potential IHE roles for each architecture component.
|
Panel | ||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||
Prepare and share a framework for talking about OHIE Certification
|
Panel | |||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||||||||||||||
Create a proposal for the roles of Instant OpenHIE, IHE and other tooling in the Data exchange Certification process.
|
Panel | ||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||
Determine how each requirement will be evaluated (method and criteria).
|
Panel | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||
Take a fresh look at the Architecture Meeting structure and propose a path forward
|
Panel | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||
Determine who needs to participate in the Architecture Leads
|
Panel | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Figure out a way to tag projects in GitHub as well as tagging FHIR IGs
|