You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 10 Next »

This page represents the hierarchy of activities performed by the Technical Working Group.

Members

  • Dimagi
    • Andrea King
    • Norman Hooper
  • Medic Mobile
    • Michael Kohn
    • Marc Abbyad
  • Ona
    • Sam Kang'a
    • Carolyn Footitt
    • Craig Appl
    • Francis Otieno

Active Work

Time period: Nov 2020 - Jan 2021

  1. (Done) Write down Real World Integration Experiences (by Nov 23rd)
  2. (Done) Abstract Real World Integration experiences into generic interoperability workflows and user personas, we can build out technical workflows (by Dec 7th)
  3. Use them to figure out proposed architectures and use them to figure out a value proposition which includes user workflows
  4. Once we build out technical workflows, we can compare them against the existing OpenHIE workflows (roughly by the 15th of Dec)
  5. Then, we can identify FHIR specifications and begin make decisions on implementation details

TWG Total Roadmap


Due DateDescriptionSOW #Status
2021-January-15

Priority use cases and software identified

  • Draft workflow diagrams
  • Draft indicators for priority use cases
5
2021-January-15

HL7 FHIR, HIE profiles and CQL for reference architecture reviewed

  • List of definitions of foundational resources
  • Gap analysis for CHIS related needs
  • Analysis of deployment options
6
2021-January-30

Proposed reference architecture sketched out, software identified, and mapped to OpenHIE architecture

  • Architecture and data flow diagram created
7
2021-February-26

Key CHIS capabilities and components mapped to WHO classifications

4
2021-March-15

 Shared concept library and associated concept map identified or developed

  • List of required concepts 
  • Selection of available libraries and tooling
  • Gap analysis 
  • Standardized HL7 FHIR artifacts
8
2021-March-31

Proof-of concept built

  • All components installed on shared infrastructure and configured to support chosen use cases
  • Documented consensus that the workflow is meeting requirements 
  • Working prototype as a reference
  • (TBD) PoC built with “second choice” tooling
9
2021-May-31

Documentation completed

  • Documented consensus - Delphi study findings published
  • Technical docs complete
10
2021-May-31

 Learnings socialized with wider CoP

  • Documentation site chosen and created
  • Technical and other documentation created and prepared for public dissemination
  • Document covering known limitations
  • Posts and webinars on predetermined fora 
  • Targeted publications and marketing
11

Child Pages

  • No labels